• Panorama Village Building
     
    Since the opening of the Mount Nittany Elementary School in the fall of 2011, the Panorama Village building has been vacant.  The Board of School Directors authorized a feasibility study to determine future utilization potential for this building. Based on that study the Board has authorized design of a phase 1 project, which will include the relocation of print shop services from the College Heights building, relocation of Physical Plant services from the Nittany Ave. and Fairmount Ave. buildings, and a district-wide meeting space.  The preliminary floor plan and schedule for this project can be accessed at the links below:

     
Last Modified on January 1, 2013