- Physical Plant and Facilities
- Panorama Village Building
Districtwide Facilities Master Plan 2009
-
Panorama Village BuildingSince the opening of the Mount Nittany Elementary School in the fall of 2011, the Panorama Village building has been vacant. The Board of School Directors authorized a feasibility study to determine future utilization potential for this building. Based on that study the Board has authorized design of a phase 1 project, which will include the relocation of print shop services from the College Heights building, relocation of Physical Plant services from the Nittany Ave. and Fairmount Ave. buildings, and a district-wide meeting space. The preliminary floor plan and schedule for this project can be accessed at the links below:
Last Modified on January 1, 2013