•  Progress from April through November 2013 on both the east and west sides of the stadium.
     
     East side sink hole work
     
    West side bleacher and wall repair/replacement
     
    The east side work is a project by State College Borough. They dug to find both the throat of the sinkhole and also a solid foundation for building a reverse filter and water conveyance system. They  maintained the current water conveyance structure to handle any storms that may arrive until they are ready to rebuild. The new conveyance system is now being built.
    The west side work involves bleacher removal and excavation and rebuilding the retaining wall and then replacing the bleachers, sidewalk, and stonework.
     
     October 24, 2013
    More sidewalk is installed
    More sidewalk completed  
     
     October 11 2013
    Special detail planned for corner of Fairmount & Fraser Sts.
    Special detail planned  
     
     October 3, 2013
    Sidewalk partially completed.
    Sidewalk at northeast corner  
     
     September 27, 2013
    Sidewalk being laid.
    Sidewall cement is installed  
     
     September 6, 2013
    Preparing for the first home football game.
    preparing for the first football game to be played on the field  
     
     September 5, 2013
    West side bleachers are being installed.
    West Side bleachers are installed  
     
     August 29, 2013
    Bleachers begin to be installed.
    Bleachers go in  
     
     August 12, 2013
    Football practice is able to take place while construction continues.
    Football practice  
     
     August 5, 2013
     A layer of sand is applied to the turf as part of the installation.spreading sand on new artificial turn
     
     August 2,  2013
    Concrete is poured in the northeast corner.
    Cement pour  
     
     July 31, 2013
     The artificial turf goes in and the S is applied.The S is applied to the artificial turf
     
     July 29, 2013
    The artificial turf is being installed.
    the artificial turf is being installed  Turf begins to be laid
     June 13, 2013
     Sink hole area
      June 13, 2013
     water conveyance from the west side of the field
     June 6, 2013
     part of the conduction system at the sink hole
      June 6, 2013
    water conveyance system from west side of field  
     May 16, 2013
     The sink hole is filled in
    May 16, 2013
     
    Lots of work taking place on the west side
     May 6, 2013
    part of the drainage system  
     May 6, 2013
    wall excavation viewed from the parklet  
     May 2, 2013
    Sink hole drainage system becomes evident  
      May 2, 2013
    Preparing for the westside wall repair.
    Work continues on the west side walls  
     April 19, 2013
    water conveyance structures ready to be installed
     April 19, 2013
    the wall comes down
     April 18, 2013
    With the help of Alpha Fire Company we blasted 1,500 gpm of water into the sinkhole for 15 minutes April 18. There was no refusal of water and it appeared to be capable of accepting at least double or triple that rate. Building of the filter (rock installation) will begin soon.
    Water test of sink hole  
     April 18, 2013
    Workers prepare to remove one of the lights on the west side of the stadium so they can continue work on the west side wall area.
     
     
     
    taking down the light pole on the west side  
     April 17, 2013
    sides of the hole are covered to keep rain erosion to a minimum  
     April 17, 2013
    work on the Fraser St. wall  
     April 16, 2013
    throat of sink hole  
     April 16, 2013
    Gravel is spread where bleachers were removed  
     April 12, 2013
     
    April 12, 2013
     
    work on the sink hole continues   more bleachers are removed  
     April 9, 2013
    The hole grows bigger  
     April 9, 2013
    bleachers are being removed on the west side  
     April 8, 2013
    The hole is getting deeper  
    April 8, 2013
    Bleacher removal work continues  
    April 5, 2013
    sink hole work continues  
    April 5, 2013
    Work starts on retaining wall  
    April 4, 2013 backhoe digging around sink hole  
    April 4, 2013Bleachers are being removed from the west side  
       
     