Memorial Field
Page Navigation
- Memorial Field Renovations
- Pave It Forward - Buy a Brick Campaign
- Board Updates 2013
- Board Updates 2012
- Brief History
- April 25, 2011- Board presentation (final schematic design)
- 2010 Information and Action on the Memorial Field Design Project
- 2009 Information and Action on Memorial Field Project
- 2008
- 2007
- 2006 Memorial Field Master Plan
- 2003 Renovations
- Photos
-
Progress from April through November 2013 on both the east and west sides of the stadium.East side sink hole workWest side bleacher and wall repair/replacement
The east side work is a project by State College Borough. They dug to find both the throat of the sinkhole and also a solid foundation for building a reverse filter and water conveyance system. They maintained the current water conveyance structure to handle any storms that may arrive until they are ready to rebuild. The new conveyance system is now being built.
The west side work involves bleacher removal and excavation and rebuilding the retaining wall and then replacing the bleachers, sidewalk, and stonework.
October 24, 2013More sidewalk is installedOctober 11 2013Special detail planned for corner of Fairmount & Fraser Sts.October 3, 2013Sidewalk partially completed.September 27, 2013Sidewalk being laid.September 6, 2013Preparing for the first home football game.September 5, 2013West side bleachers are being installed.August 29, 2013Bleachers begin to be installed.August 12, 2013Football practice is able to take place while construction continues.August 5, 2013A layer of sand is applied to the turf as part of the installation.August 2, 2013Concrete is poured in the northeast corner.July 31, 2013The artificial turf goes in and the S is applied.July 29, 2013The artificial turf is being installed.June 13, 2013June 13, 2013June 6, 2013June 6, 2013May 16, 2013May 16, 2013
May 6, 2013May 6, 2013May 2, 2013May 2, 2013Preparing for the westside wall repair.April 19, 2013April 19, 2013
April 18, 2013With the help of Alpha Fire Company we blasted 1,500 gpm of water into the sinkhole for 15 minutes April 18. There was no refusal of water and it appeared to be capable of accepting at least double or triple that rate. Building of the filter (rock installation) will begin soon.April 18, 2013Workers prepare to remove one of the lights on the west side of the stadium so they can continue work on the west side wall area.April 17, 2013April 17, 2013April 16, 2013April 16, 2013April 12, 2013
April 12, 2013April 9, 2013April 9, 2013April 8, 2013April 8, 2013April 5, 2013April 5, 2013
April 4, 2013 April 4, 2013